Archive

Archive for the ‘service-is-project-managing’ Category

Code documentation for a job ticket assignment and reporting application

  1. JobAssignments allows for managing job tickets with easy tagging and filtering of task assignments, and for aggregate analysis and reporting. 
  2. Originally developed only for simple tag aggregation reports (watch a demo), JobAssignments  can now also analyze the tag graph: jobassignments_tags_keyneighbours
  3. Click the table of contents on the right to browse the VBA documentation built with Aivosto.
  4. imageimage

Getting answers for the LRC management from Report Express

    1. Report Express is a powerful tool to get current enrolment data which seems vital for running the LRC, but which I have not been able to get my hands on before easily (SCT-Banner limits access too much).
    2. Excel download format – which I recommend : cleaner (fewer graphics) and more information – DOES work, but for Excel 2010, I have to rename the download file extension from XLS to HTML (which the download is) and “open with”  –> Excel.
    3. I have not been successful merging these output files per language on the command line into one large HTML file and cleaning up the <html><body> framework – so I have to open each one, merge by copy/paste the contents of the result worksheet into a new worksheet and clean up the data in there by converting into an Excel Table and sorting by a suitable table column, e.g. ID, which puts all actual enrolment data sequentially, and separates all (redundant anyways) header and footer information.
    4. I finally added table columns with array formulas to calculate the enrolment aggregates,
      1. per this section (to answer questions like: will this class fit into the language resource center?),
      2. this course # (to answer questions like: where can we have maximum impact on improving learning with technology with creating the minimum of new learning/assessment materials. Assessment is standardized per course #.)
      3. and per language-level.
    5. Finally,  vlookup-columns allow me to link the instructor of record and other missing class information (room, building, time) to the student enrolment rows. This allows me to filter, sort and search the enrolment sheet with real-life questions, like
      1. can we support this size class/course/level and language in the LRC
      2. is it practical to relocate this course for part/a whole class meeting to the LRC
      3. which students need be given access permissions to the SANAKO
      4. etc.
    6. Sample filter of the aggregate sheet: enrolment-with-vlookup

Wimba Classroom –> Saba Centra: A running log

  1. http://teaching.uncc.edu/ctl-blog/centra-classroom-replace-wimba
  2. As this pertains to the LRC, more info will be posted here, as it becomes available, and issues and resolutions, as they come up.

No- and Low-cost Language Labs in a Tough Economy. Presentation EUROCALL 2009

Or digitizing the London Metropolitan University City-of-London Conference Interpreting center.
Or download a screencast of my presentation.

Interpreting Lab Upgrade: Requirements and Vendors (Presentation 2009-07)

Screen-cast of my Slide Presentation: londonmet-interpreting-lab-upgrade-presentation1.wmv

Table of Contents:

00m:30s

Requirements For A Conference Interpreting Training Installation

07m:20s

Flowchart Digitization Of Learning

18m:00s

Vendor Solutions Categories

19m:00s

Vendor Solutions: Conference Interpreting Category

21m:50s

Vendor Solutions: Classroom Management Category

23m:55s

Vendor Solutions: Classroom Management Category: Face To Face Teaching Flowchart

29m:25s

Vendor Solutions: Classroom Management Category: Comparison

30m:30s

Vendor Solutions: Classroom Management Category: Synchroneyes

32m:30s

Vendor Solutions: Conference Interpreting Category: Braehler

36m:00s

Vendor Solutions: Language Lab Category

37m:24s

Vendor Solutions: Language Lab Category: Artec

59m:10s

Vendor Solutions: Language Lab Category: Sanako Lab 100 Sts

73m:30s

Vendor Solutions: Language Lab Category: Sanako Study 1200

87m:20s

Vendor Solutions: Language Lab Category: Sony Virtuoso

102m:20s

Summary & Question Period

105m:25s

Audience Feedback On Presentation

Demoing a requirements gathering template for IT project management

Designed for SME focus group meeting capture when upgrading the City-of-London conference interpreting facility at London Metropolitan University. Querying users for business requirements in use case form. Watch a demo:

to generate functional requirements:

Interpreting_upgrade_xls_glossary

and to generate technical requirements (and questions for vendors):

Interpreting_upgrade_xls_tech

While keeping an eye on requirements metrics (what is important, contentious, unclear):

Interpreting_upgrade_xls_tags

Saville Interpreting Suite layout diagram

visio_interpreting

Which I had to derive from photos:

image

MS Project training notes

screencast ms-project training

  • Course is about setting up a project, not tracking (but beginnings will be covered)
  • file menu
    • save as: e.g. webpage
  • edit
    • undo: only 1 undo level
    • tasks
      • split
  • view
  • calendar
    • :base calendar: tools / options
    • tools / change calendar [how does this relate?]
      • these are company holidays
      • can it load holidays like outlook – yes, from project central server
      • attach the calendar to the project: project / project information
        • many projects are built from finish date, but that leaves no slack time
  • tasks pane
    • used only with project central server?
  • tool bars
    • standard
    • format
    • ask pane
    • project: quicker ways than that
  • insert subtasks
    • simply press insert key to insert rows
    • 0 duration = milestone (can also have a milestone with a duration)
  • constraints
    • difference between a deadline and a constraint: deadline is less important
  • review
    • start
      • project start date: menu / project:
      • calendars:
        • base calendar = tools / options / calendar
        • project calendar  = tools / change working time / new
        • assign / attach that project calendar to the project:  menu: project: project information
        • show holidays on Gantt chart: context menu: Gantt chart: nonworking time (option: in front of the taskbars: interrupts the taskbars)
      • recurring tasks: menu: insert: recurring task
      • set duration: d = day, m = minute, mo = month, w = week
      • creating link relation ships
        • visually by dragging tasks onto each other in the Gantt chart
        • writing in field predecessors (sf is default, s=stat, f=finish, relation ship), -lag and +lead time
        • constraints and deadlines
    • resources
      • types
        • WORK: REUSABLE
        • MATERIAL: CONSUMABLE
      • groups
        • teams
        • internal or external
        • suppliers
      • max units
        • e.g. FULL TIME OR HALF TIME PERSON
  • last hour
    • resources – critical (overrun) tasks
      • reallocating resources to reduce slack and slippage
    • baseline
      • set: menu: tools / tracking / baseline
      • in the Gantt chart, the blackline is the baseline
    • tracking
      • recommended to always display the tracking toolbar
    • reports
      • menu: view / reports
  • Outlook: level 2 training
    • tracking
      • split task
      • update task
    • customization (views, reports, filters)
    • master projects
    • resource pools